Today the cleaners were there and I must say, the house looks amazing without all the dirt and dust everywhere. I can't wait to get in there. Here are a few photos. You will notice there are a few things missing from the kitchen, like the dishwasher, oven, rangehood etc, but they are installed after handover. Also the loos haven't been installed as there was a delay in their deliver due the storm and we are just waiting on the plumbers to come back. It's been such a LONG journey (this whole process started when we bought the land back in September 2013), but we are nearly there!!

Looking through the front door

Looking back to the porch

Looking down the hallway

Pano of our room

Another pano of our room

Ensuite

Walk in. I has asked they not install those racks as we are getting wardrobe built in so they will need to pulled down and the wall repaired.

Living room

Looking at the computer nook from the living room

Kitchen looking from the dining area

My kitchen. Silicone will be done today so that big space won't always be in the floor =)

Kitchen, panty looking towards dining area

 Looking down the hall to the 4th bedroom from activities room

Lachlan & Patrick's room

Amelia's room

Looking at the kids rooms from the activities room

Looking up the hallway from bedroom 4

Laundry

Looking at the kitchen/family area from dining area

The cutouts 

The family room

Pantry

Activities room

Pano of main bathroom

 Main bathroom

Garage

Looking from our neighbours yard to our back yard. Our water tank got a little damaged in the storm when it fell over, so hubby and I are hoping we can get a new one and change the colour to the same as the roof (monument).

7 comments:

  1. Wow Nel it's looking great. When are you getting the keys?

    ReplyDelete
  2. We are doing our final inspection tomorrow with our SS. We won't be able to get the keys then as Allworth haven't given us the final invoice yet, which I can't send to our broker. Even when that happens, the bank can take up to 7 days to pay the final invoice. So I am not exactly sure when we'll get the keys. There are a few little things I want to make sure get fixed before we move in too.

    ReplyDelete
  3. How did your final inspection go today? Have you received your final invoice yet?
    The painters were suppose to start this week but no one has been there.

    ReplyDelete
  4. We had the final inspection yesterday. We went through with a fine tooth comb and found a few repairs that need addressing. Mainly paint touch ups, a few cracks in the cornices but apparently that normal as the house it settling. Some tiles also need replacing. I want some power points moved in the ensuite and we need a new water tank (it fell down and was damaged in the April storms). We put everything in writing and signed off. We were given the final invoice by the SS so I have sent that off already. Just waiting on the valuation inspection and final payment and we can get the keys. We have the prelim occupancy cert so need to get the driveway done and the side fence/retaining wall and lawn so we can remove the siltation thing at the front. Once that's done we will get the full occupancy cert. It's all so exciting now!

    ReplyDelete
  5. That's very exciting Nel.
    How strange that they gave you your invoice on final inspection & we received our yesterday in the mail & they are still at least 2 weeks away from finishing.

    ReplyDelete
  6. We were chasing it up for nearly two weeks and have only just now discovered we are over contract price by about $950 which WE have to cover. Apparently there was extra money required to do some rock excavation but we weren't notified so now the bank will go to pay the final invoice and it's MORE than what they are expecting. I am furious. We should have been told about this ages ago to arrange extra funds with the bank before now.

    ReplyDelete
  7. They have put on our invoice extra for scaffolding i sent an email asking to see the actual invoice as they have to provide it to you. They have given us a copy of the invoice for the extra amount for our plumbing. Yes they should have given it to you earlier it's not very fair. We were lucky we got credits back for soil removal & piers so have less to pay.

    ReplyDelete