Monday 30 March 2015

Garage door is on

Our garage door was installed today. I have always been a bit worried it would look too dark and that the window strip at the top would look a bit funny as I haven't actually seen one like it but I am happy to say I LOVE it!


Wednesday 25 March 2015

Block has been leveled

We decided we'd get the block leveled so we can have access up the side of the house and a leveled backyard for the kids to play in. Can also see where we are working now re: retaining walls on all sides now.




To be retained on our 'high' side

  
To be retained at the back

  After our neighbours cut in to begin their build, this is what needs to be retained on the 'low' side...

Friday 13 March 2015

Vanities are in

Today we met our site supervisor Wayne onsite to have a good look at our kitchen install. I was very surprised to see the vanities had also been installed.

 Ensuite
I am so happy with the finish on the cupboards in the ensuite. We had to make a snappy decision when we signed the contract as the colour we'd actually picked was only a benchtop colour. Nothing else was what we were looking for so we just went with black. I think it looks great and will look fab with our feature tile on the shower.

Main Bathroom. Baths in too!

Wednesday 11 March 2015

Kitchen Install

WOW!!! Our kitchen install has begun. We had a bit of a sneak peak through the window today and I am sooo excited to see it come together.






Waterproofing

Was great to see the waterproofing has been done. Not long now until tiling can begin.


Ensuite

Main Bathroom

Laundry

Friday 6 March 2015

Lock Up

Well today marks the day we are officially in lock up stage. Kitchen is due next week! Can't wait for the inside to start to come together.

Front door is on (which will be painted in Manor Red)

Monday 2 March 2015

Gyprocking completed

YAY!! The gyprocking is all done! House should be locked up this Friday (6th) and kitchen install the following week as well as waterproofing. It's all happening now! Handover date at this stage is 4th May.

 Looking from front door down the hallway toward kitchen entry

Looking back up the hallway from entry into kitchen back toward the front door

 
 Our bedroom windows

Ensuite with what will be our double vanity

 Living room looking from computer nook area

Computer nook looking from living room (Hi there Patrick)

 Looking towards the kitchen from dining room

Looking towards the family room from entry into kitchen

  
My HUGE pantry!

 Looking at the cutouts on the dining room wall
 
Lachlan and Amelia playing peek-a-boo

 Kids & their rooms

 
Panorama looking from the boys room

 Looking from the 4th bedroom towards the kids rooms

 
 Main bathroom - Amelia's on the loo and Lachlan's in the shower

The boys in the garage